Loading
Page views this IP this session = 1 of 10 unsubscribed pagesWithernwick Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Withernwick Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Withernwick Wind Farm (Wind , Active) Location in the UK : England, Humberside, North of Aldbrough Type of installation: Wind on/offshore: on Turbines :9 Capacity : 18 MW Approx Date of 1st power generation: March 2013
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
This proposal is for nine 2.0/2.5 MW turbines near the village of Withernwick near Aldbrough, south of Hornsea near the East Yorkshire coast. This proposal would save over 1 million tonnes of carbon dioxide emissions over the 25 year life of the wind farm. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Withernwick Wind Farm Cowden Lane Withernwick HU11 4UH
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Withernwick extension 8.2 MW
|
Energy Type: |
Wind Onshore |
County: |
Humberside Country: England LPA: East Riding of Yorkshire Council
|
Site ID and Reference: |
4432 / C2584
District:
|
Applicant: |
Energiekontor UK
Application :
14/01919/STPLFE
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
4 |
Turbine Capacity: |
2.0499999999999998 |
Height of Turbines: |
|
Calculated capacity: |
8.2 |
Site Address: |
Land North And North East
Homer House
Aldbrough Road
Withernwick
East Riding Of Yorkshire
|
|
|
County: |
Humberside Region: Yorkshire and Humber
|
OS Coordinates: |
520743 / 520743
|
Development Status: |
Operational
|
Application Submitted: |
6/24/2014
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
6/10/2015
|
Construction Date: |
9/15/2018
|
|
|
Generator Live |
8/1/2019
|
This Record Last Updated: |
11/19/2019
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
10/15/2015 |
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
6/10/2015 |
Site Name: |
Withernwick 18 MW
|
Energy Type: |
Wind Onshore |
County: |
Humberside Country: England LPA: East Riding of Yorkshire Council
|
Site ID and Reference: |
3987 / EN00604
District:
|
Applicant: |
Energiekontor UK
Application :
08/01964/STPLFE
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
9 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
18 |
Site Address: |
Land North And North East
Homer House
Aldbrough Road
Withernwick
East Riding Of Yorkshire
|
|
|
County: |
Humberside Region: Yorkshire and Humber
|
OS Coordinates: |
520325 / 520325
|
Development Status: |
Operational
|
Application Submitted: |
4/4/2008
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
9/2/2008
|
Construction Date: |
4/1/2012
|
|
|
Generator Live |
3/19/2013
|
This Record Last Updated: |
6/3/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
9/2/2008 |
Site Name: |
Withernwick (withdrawn) 25 MW
|
Energy Type: |
Wind Onshore |
County: |
Humberside Country: England LPA: East Riding of Yorkshire Council
|
Site ID and Reference: |
2998 / EN00349
District:
|
Applicant: |
Energiekontor UK
Application :
07/02271/STPLFE
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
11 |
Turbine Capacity: |
1 |
Height of Turbines: |
|
Calculated capacity: |
11 |
Site Address: |
Land South North And North East
Homer House
Aldbrough Road
Withernwick
East Riding Of Yorkshire
|
|
|
County: |
Humberside Region: Yorkshire and Humber
|
OS Coordinates: |
520730 / 520730
|
Development Status: |
Planning Application Withdrawn
|
Application Submitted: |
4/5/2007
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
6/9/2010
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
10/17/2007 |
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 36 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 12 m/s (26.844 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/16/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|